LOWEST EVALUATED BIDDER
2 posters
Page 1 of 1
LOWEST EVALUATED BIDDER
RJM,
Thank you very much for the very explanatory answer of the topic above, I've really understood what that is all about.
Hussein.
Thank you very much for the very explanatory answer of the topic above, I've really understood what that is all about.
Hussein.
Hussein- Posts : 2
Join date : 2010-06-09
Re: LOWEST EVALUATED BIDDER
As per definition provided in R2(3)/97/2005, the "lowest evaluated cost" means the price offered by a supplier, service provider, or contractor that is found to be the lowest after consideration of all relevant factors and the calculation of any weighting for these factors, provided that such factors have been specified in the tender documents. It can be deduced from the definition that the “lowest evaluated bidder” is the bidder whose bid has been evaluated and found offer lowest cost as well as meet all terms and conditions stipulated in the bid documents.
Hussein, from the definition it is clear that not only price is considered in obtaining bidder with lowest cost but also terms and conditions stipulated in the bid documents. In evaluation process, basically there are three stages of evaluation [1] preliminary examination – result is the substantially responsive bids, [2] detailed evaluation – result is the lowest evaluated bidder and [3] post-qualification (due diligence) – successful bidder with capacity and capability to execute the contract. Therefore, stage 1 & 2 result to “lowest evaluated bidder” before subjected to post-qualification.
Regarding, Engineer’s Estimate vs Lowest Evaluated Cost visit topic “Predetermined Tender Value [Engineer’s Estimate]” under Tendering Processes, Procedures and related Guidelines in this forum. However, it worth to note that PEs are empowered to reject/annul all bids in case they are above the budget pursuant to S54(2)/PPA2004 and R20(2)/97/2005.
Hussein, from the definition it is clear that not only price is considered in obtaining bidder with lowest cost but also terms and conditions stipulated in the bid documents. In evaluation process, basically there are three stages of evaluation [1] preliminary examination – result is the substantially responsive bids, [2] detailed evaluation – result is the lowest evaluated bidder and [3] post-qualification (due diligence) – successful bidder with capacity and capability to execute the contract. Therefore, stage 1 & 2 result to “lowest evaluated bidder” before subjected to post-qualification.
Regarding, Engineer’s Estimate vs Lowest Evaluated Cost visit topic “Predetermined Tender Value [Engineer’s Estimate]” under Tendering Processes, Procedures and related Guidelines in this forum. However, it worth to note that PEs are empowered to reject/annul all bids in case they are above the budget pursuant to S54(2)/PPA2004 and R20(2)/97/2005.
RJM- Posts : 260
Join date : 2009-07-30
Age : 73
Location : What is written without effort is in general read without pleasure
LOWEST EVALUATED BIDDER
Hi every body,
I'm always confused with the statement "Lowest Evaluated Bidder" does this mean that the Bidder with lowest amount of money for the bid shall be selected after fulfilling other legal requirements? How about the Lowest in sum of money below Engineers' Estimate?. If there happen the Lowest evaluated bidder have higher amount than the Engineers' estimate will it be acceptable. Please educate me.
I'm always confused with the statement "Lowest Evaluated Bidder" does this mean that the Bidder with lowest amount of money for the bid shall be selected after fulfilling other legal requirements? How about the Lowest in sum of money below Engineers' Estimate?. If there happen the Lowest evaluated bidder have higher amount than the Engineers' estimate will it be acceptable. Please educate me.
Hussein- Posts : 2
Join date : 2010-06-09
Similar topics
» RESPONSIVE BIDDER vis a vis RESPONSIBLE BIDDER
» BID SECURITY
» Can Agent/Bidder change manufacturer/principal after awarding/extension?
» PERFORMANCE BOND & ADVANCE PAYMENT BOND FOR FOREIGN BIDDER
» BID SECURITY
» Can Agent/Bidder change manufacturer/principal after awarding/extension?
» PERFORMANCE BOND & ADVANCE PAYMENT BOND FOR FOREIGN BIDDER
Page 1 of 1
Permissions in this forum:
You cannot reply to topics in this forum
|
|
Wed Dec 18, 2019 9:13 pm by yohanaamon@yahoo.com
» Is non-submission of invalid CRB receipt voucher a major deviation?
Tue Dec 17, 2019 1:00 am by RJM
» MAKANDARASI KUWEKWA NDANI KWA KUTOKAMILISHA MIRADI NDANI YA MUDA
Tue Dec 17, 2019 12:46 am by RJM
» How Supplier can register in e-Procurement system (TANePS)
Thu Dec 12, 2019 5:48 am by pms
» Kukosekana risiti ya ununuzi wa tenda
Sat Apr 27, 2019 6:05 pm by ALLY MUNIR
» IS IT TIME TO THINK OF DEACTIVATING TENDER BOARDS AND INTRODUCE A MECHANISM OF PROCUREMENT PROFESSIONAL OPINION?
Thu Apr 11, 2019 3:40 pm by pms
» e-Procurement System is now operational
Thu Apr 11, 2019 3:14 pm by Admin
» TENDA ZINAPOKOSA WAOMBAJI
Thu Jan 10, 2019 10:42 pm by thanksme
» Attendance of District Treasurer in Council Tender Board meetings
Mon Mar 19, 2018 8:57 pm by GWK