EVALUATION
4 posters
Tanzania Public Procurement Forum :: PUBLIC PROCUREMENT ACT AND REGULATIONS :: Procurement of Goods, Works and Non Consultancy Services
Page 1 of 1
Re: EVALUATION
RJM
THANKS FOR YOUR CLARITY CLARIFICATION AND CONTRIBUTION ON EVALUATIN
THANKS FOR YOUR CLARITY CLARIFICATION AND CONTRIBUTION ON EVALUATIN
Rutaihwa- Posts : 58
Join date : 2011-09-29
Age : 57
Re: EVALUATION
Sorry for coming on board late!
I must admit that this is a trick situation and we must acknowledge also that do happen – like the case we have now!
Having gone through submissions of the previous contributors, I learned (I stand to be corrected) most of them if not all they have treated the case at hand as either “correction of error” or “clarification issues”. My submission will focus on these two in relation to the situation.
To me the situation is neither “correction of error” no “clarifications”.
Rutaihwa wrote
CGM-''Ng'wigi'' wrote,
The clause referenced by CGM [bidder’s breakdown of prices] caters for unbalanced rates/front loading of bid to demonstrate the internal consistency of the prices with construction methods and schedule proposed.
To my view, what makes difficult for the situation at hand not to be corrected as a “correction of arithmetical errors” is the ITB Clause relating to Bid Prices.
The typical clause states “The Bidder shall fill in rates and prices for all items of the Works described in the Bill of Quantities. Items for which no rate or price is entered by the Bidder will not be paid for by the Procuring Entity when executed and shall be deemed covered by the other rates and prices in the Bill of quantities”.
Referring situation under discussion, the price for executing item of the works described in the BoQ is quoted – one can conclude that the clause has been complied – as the price for executing the item of the work has be quoted by the bidder.
From the above, I would say that the evaluation should continue without correcting or seeking clarification from the bidder. However, in the later stage [Contract Execution] if the bidder emerge the winner the challenge will be “what if the variation order is to be issued in the respective item – what will be rates will be applied in paying such variation? Will this limit the client the unilateral right to issue variation because of dilemma of the unit rate to be used?
What is your take?
I must admit that this is a trick situation and we must acknowledge also that do happen – like the case we have now!
Having gone through submissions of the previous contributors, I learned (I stand to be corrected) most of them if not all they have treated the case at hand as either “correction of error” or “clarification issues”. My submission will focus on these two in relation to the situation.
To me the situation is neither “correction of error” no “clarifications”.
Rutaihwa wrote
The result of what is being suggested by Rataihwa is a Unit Price which legally should be quoted by the respective bidders. Is this a correction of error as per respective Clause of ITB and as per R90(11)/97/2005 which states that “Notwithstanding sub-regulation (6) PE shall correct purely arithmetical errors that are discovered during the examination of tenders …….” If we adopt this approach will this be construed as we are suggesting unit price for bidder which he did not contemplate and will it be accepted? I believe by virtual of the respective Clause ITB [Correction of Arithmetical Errors] the situation cannot be mended by correction of error as it will be contravening the respective clause.“1. Since the quantity and amount is there means the rate also is there by dividing amount and QUANTITY by doing so you are not changing anything”.
CGM-''Ng'wigi'' wrote,
I doubt if this can be treated as issue to seek clarification from the bidder – if so what kind of clarification should PE seek?“26.1 To assist in the examination, evaluation, and comparison of bids and post-qualifications of Bidders, the Procuring Entity may, at its discretion, ask any Bidder for clarification of its bid including breakdown of prices. Any clarification submitted by a Bidder that is not in response to a request by the Procuring Entity shall not be considered”.
The clause referenced by CGM [bidder’s breakdown of prices] caters for unbalanced rates/front loading of bid to demonstrate the internal consistency of the prices with construction methods and schedule proposed.
To my view, what makes difficult for the situation at hand not to be corrected as a “correction of arithmetical errors” is the ITB Clause relating to Bid Prices.
The typical clause states “The Bidder shall fill in rates and prices for all items of the Works described in the Bill of Quantities. Items for which no rate or price is entered by the Bidder will not be paid for by the Procuring Entity when executed and shall be deemed covered by the other rates and prices in the Bill of quantities”.
Referring situation under discussion, the price for executing item of the works described in the BoQ is quoted – one can conclude that the clause has been complied – as the price for executing the item of the work has be quoted by the bidder.
From the above, I would say that the evaluation should continue without correcting or seeking clarification from the bidder. However, in the later stage [Contract Execution] if the bidder emerge the winner the challenge will be “what if the variation order is to be issued in the respective item – what will be rates will be applied in paying such variation? Will this limit the client the unilateral right to issue variation because of dilemma of the unit rate to be used?
What is your take?
RJM- Posts : 260
Join date : 2009-07-30
Age : 73
Location : What is written without effort is in general read without pleasure
EVALUATION
Chimola
Reg 90 (10) GN 97 PE may ask Suppliers for clarification......... but no advantages shall be sought,offered,or permitted to change any matter of substance change in the tender,including changes in price and changes aimed at making an responsive tender responsive.
1. Since the quantity and amaount is there means the rate also is there by dividing
amount and QUANTITY by doing so you are not changing any thing.
2. PE may regard this as minor deviation. Reg 9o (11) (a) Pe may regard a tender as
responsive even if it contains minor deviations that do not materially alter or depert
from the characteristics......................or it contains errors or oversights that are
capable of being corrected without touching on the substances of the tender.
3. ITB CLAUSE 27.4 PE may waive any minor informality, nonconformity, or irregularity
in a bid which does not constitute a material deviation, provided such waiver does
not prejudice or affect the relative ranking of any bidder.
4. ITB CLAUSE 27.7 PE may waive any minor informality, nonconformity, or irregularity in
a bid which does not contitute a material deviation, provided such waiver does not
prejudice or affect the relative ranking of any bidder as result of the technical or
commercial evaluation pursuant to ITB CLAUSE 26 & 28.
Reg 90 (10) GN 97 PE may ask Suppliers for clarification......... but no advantages shall be sought,offered,or permitted to change any matter of substance change in the tender,including changes in price and changes aimed at making an responsive tender responsive.
1. Since the quantity and amaount is there means the rate also is there by dividing
amount and QUANTITY by doing so you are not changing any thing.
2. PE may regard this as minor deviation. Reg 9o (11) (a) Pe may regard a tender as
responsive even if it contains minor deviations that do not materially alter or depert
from the characteristics......................or it contains errors or oversights that are
capable of being corrected without touching on the substances of the tender.
3. ITB CLAUSE 27.4 PE may waive any minor informality, nonconformity, or irregularity
in a bid which does not constitute a material deviation, provided such waiver does
not prejudice or affect the relative ranking of any bidder.
4. ITB CLAUSE 27.7 PE may waive any minor informality, nonconformity, or irregularity in
a bid which does not contitute a material deviation, provided such waiver does not
prejudice or affect the relative ranking of any bidder as result of the technical or
commercial evaluation pursuant to ITB CLAUSE 26 & 28.
CGM-''Ng'wigi'' wrote:Chimola,
The action to be taken should be refered to the tender document issued to bidders. Let say for BOQ's refered to procurement of works for medium and large works. In this document it is allowed for the PE to do the following, the ITB from said document is extracted as followings;
''ITB Clasuse 26''- Clarification of Bids
26.1 To assist in the examination, evaluation, and comparison of bids and post-qualifications of Bidders, the Procuring Entity may, at its discretion, ask any Bidder for clarification of its bid including breakdown of prices. Any clarification submitted by a Bidder that is not in response to a request by the Procuring Entity shall not be considered.
26.2 The request for clarification and the response shall be in writing or by cable, telex, or facsimile, but no change in the price or substance of the bid shall be sought, offered, or permitted except as required to confirm the correction of arithmetic errors discovered by the evaluation committee in the evaluation of the bids in accordance with ITB Clause 28.
This citation is apparently to that of Regulation 90(10), GN/97,2005 of PPA 2004.
Chimola, please take action in aspect to this law provisions.
Last edited by Rutaihwa on Thu Oct 20, 2011 4:48 pm; edited 1 time in total (Reason for editing : typing error)
Rutaihwa- Posts : 58
Join date : 2011-09-29
Age : 57
Re: EVALUATION
Chimola,
The action to be taken should be refered to the tender document issued to bidders. Let say for BOQ's refered to procurement of works for medium and large works. In this document it is allowed for the PE to do the following, the ITB from said document is extracted as followings;
''ITB Clasuse 26''- Clarification of Bids
26.1 To assist in the examination, evaluation, and comparison of bids and post-qualifications of Bidders, the Procuring Entity may, at its discretion, ask any Bidder for clarification of its bid including breakdown of prices. Any clarification submitted by a Bidder that is not in response to a request by the Procuring Entity shall not be considered.
26.2 The request for clarification and the response shall be in writing or by cable, telex, or facsimile, but no change in the price or substance of the bid shall be sought, offered, or permitted except as required to confirm the correction of arithmetic errors discovered by the evaluation committee in the evaluation of the bids in accordance with ITB Clause 28.
This citation is apparently to that of Regulation 90(10), GN/97,2005 of PPA 2004.
Chimola, please take action in aspect to this law provisions.
The action to be taken should be refered to the tender document issued to bidders. Let say for BOQ's refered to procurement of works for medium and large works. In this document it is allowed for the PE to do the following, the ITB from said document is extracted as followings;
''ITB Clasuse 26''- Clarification of Bids
26.1 To assist in the examination, evaluation, and comparison of bids and post-qualifications of Bidders, the Procuring Entity may, at its discretion, ask any Bidder for clarification of its bid including breakdown of prices. Any clarification submitted by a Bidder that is not in response to a request by the Procuring Entity shall not be considered.
26.2 The request for clarification and the response shall be in writing or by cable, telex, or facsimile, but no change in the price or substance of the bid shall be sought, offered, or permitted except as required to confirm the correction of arithmetic errors discovered by the evaluation committee in the evaluation of the bids in accordance with ITB Clause 28.
This citation is apparently to that of Regulation 90(10), GN/97,2005 of PPA 2004.
Chimola, please take action in aspect to this law provisions.
CGM-''Ng'wigi''- Posts : 16
Join date : 2011-10-02
EVALUATION
During Evalution it was discovered that one bidder in the BOQ did not qoute Rate but insert the Amount What action to be taken
Chimola- Posts : 4
Join date : 2009-08-11
Location : Dodoma
Similar topics
» Evaluation process!
» EVALUATION COMITEE
» PMU TO REVIEW EVALUATION REPORTS
» Treatment of Discount in Bids Evaluation
» Qualifications of the Members of the Evaluation Team
» EVALUATION COMITEE
» PMU TO REVIEW EVALUATION REPORTS
» Treatment of Discount in Bids Evaluation
» Qualifications of the Members of the Evaluation Team
Tanzania Public Procurement Forum :: PUBLIC PROCUREMENT ACT AND REGULATIONS :: Procurement of Goods, Works and Non Consultancy Services
Page 1 of 1
Permissions in this forum:
You cannot reply to topics in this forum
|
|
Wed Dec 18, 2019 9:13 pm by yohanaamon@yahoo.com
» Is non-submission of invalid CRB receipt voucher a major deviation?
Tue Dec 17, 2019 1:00 am by RJM
» MAKANDARASI KUWEKWA NDANI KWA KUTOKAMILISHA MIRADI NDANI YA MUDA
Tue Dec 17, 2019 12:46 am by RJM
» How Supplier can register in e-Procurement system (TANePS)
Thu Dec 12, 2019 5:48 am by pms
» Kukosekana risiti ya ununuzi wa tenda
Sat Apr 27, 2019 6:05 pm by ALLY MUNIR
» IS IT TIME TO THINK OF DEACTIVATING TENDER BOARDS AND INTRODUCE A MECHANISM OF PROCUREMENT PROFESSIONAL OPINION?
Thu Apr 11, 2019 3:40 pm by pms
» e-Procurement System is now operational
Thu Apr 11, 2019 3:14 pm by Admin
» TENDA ZINAPOKOSA WAOMBAJI
Thu Jan 10, 2019 10:42 pm by thanksme
» Attendance of District Treasurer in Council Tender Board meetings
Mon Mar 19, 2018 8:57 pm by GWK