Feasibility study and detailed design
3 posters
Tanzania Public Procurement Forum :: PUBLIC PROCUREMENT ACT AND REGULATIONS :: Procurement of Consultancy Services
Page 1 of 1
Re: Feasibility study and detailed design
RJM/RSM + Other members in the forum,
Is there any conflict of interest shown in our current legislation apart from those of WB guideline from the point of my submission?, This is because, you have engaged the Consultant for only for feasibility study that is contract ended there. Then the Second stage is for detailed design, that is another different contract, could we say there is conflict of interest, and that to say could we say in specific notice that the one involved in the feasibility study should not apply?,
if not, suppose the one who carried out feasibility study apply in the second stage for detailed design, which provision of law will be guided by the Procuring entity to disqualify because of conflict of interest?.
Your contribution is highly needed!
Is there any conflict of interest shown in our current legislation apart from those of WB guideline from the point of my submission?, This is because, you have engaged the Consultant for only for feasibility study that is contract ended there. Then the Second stage is for detailed design, that is another different contract, could we say there is conflict of interest, and that to say could we say in specific notice that the one involved in the feasibility study should not apply?,
if not, suppose the one who carried out feasibility study apply in the second stage for detailed design, which provision of law will be guided by the Procuring entity to disqualify because of conflict of interest?.
Your contribution is highly needed!
id2013- Posts : 50
Join date : 2013-07-17
Re: Feasibility study and detailed design
RSM,
Will this water down the Conflict of Interest being referred to?
This is what World Bank Guidelines say
Unfair Competitive Advantage
1.10 Fairness and transparency in the selection process require that consultants or their affiliates competing for a specific assignment do not derive a competitive advantage from having provided consulting services related to the assignment in question. To that end, the Borrower shall make available to all the short-listed consultants, together with the request for proposals, all information that would in that respect give a consultant a competitive advantage..
Will this water down the Conflict of Interest being referred to?
This is what World Bank Guidelines say
Unfair Competitive Advantage
1.10 Fairness and transparency in the selection process require that consultants or their affiliates competing for a specific assignment do not derive a competitive advantage from having provided consulting services related to the assignment in question. To that end, the Borrower shall make available to all the short-listed consultants, together with the request for proposals, all information that would in that respect give a consultant a competitive advantage..
RJM- Posts : 260
Join date : 2009-07-30
Age : 73
Location : What is written without effort is in general read without pleasure
Re: Feasibility study and detailed design
Id2013,
This is a provoking discussion that you are initiating. I remember that Procurement Regulations prohibit inviting the consultant who has carried out feasibility study to be carry out subsquent stages of the project because of perceived conflict of interest.
I tend to agree with this provision, because a consultant who prepared the feasibility study which is used to implement the project will have an advantage over other consultants who are participating.
To overcome this, the Procurement Regulations allows that when inviting tenders for the feasibility study to make it categorically known to all participating consultants that the winning bid can be awarded downstream assignments.
Later on I will consult the Regulations to give you the exact Regulations which prohibits and allows what I have judt discussed above.
This is a provoking discussion that you are initiating. I remember that Procurement Regulations prohibit inviting the consultant who has carried out feasibility study to be carry out subsquent stages of the project because of perceived conflict of interest.
I tend to agree with this provision, because a consultant who prepared the feasibility study which is used to implement the project will have an advantage over other consultants who are participating.
To overcome this, the Procurement Regulations allows that when inviting tenders for the feasibility study to make it categorically known to all participating consultants that the winning bid can be awarded downstream assignments.
Later on I will consult the Regulations to give you the exact Regulations which prohibits and allows what I have judt discussed above.
RSM- Posts : 150
Join date : 2009-08-11
Feasibility study and detailed design
The PE floated tender to engage Consultant for detailed feasibility study to see whether the project is economic viable and profitable.
the selection process have been completed and the consultant is on site. I want to know from the point of procurement legislations is the Consultant engaged for this stage will also participate during detailed design?, take into account that the design ans supervision of the project will involve and use the information from the feasilibility study because the current exercise involve also with provision of concept design of the project sought.
the selection process have been completed and the consultant is on site. I want to know from the point of procurement legislations is the Consultant engaged for this stage will also participate during detailed design?, take into account that the design ans supervision of the project will involve and use the information from the feasilibility study because the current exercise involve also with provision of concept design of the project sought.
id2013- Posts : 50
Join date : 2013-07-17
Similar topics
» SINGLE CONTRACT TO CONSULTANT FOR FEASIBILITY STUDY, ENGINEERING DESIGN AND PROJECT SUPERVISION
» The Ethical Dilemma in Tanzania Public Procurement: Internet survey based study
» Should the Same Consultant Do Design and Construction Supervision?
» The Ethical Dilemma in Tanzania Public Procurement: Internet survey based study
» Should the Same Consultant Do Design and Construction Supervision?
Tanzania Public Procurement Forum :: PUBLIC PROCUREMENT ACT AND REGULATIONS :: Procurement of Consultancy Services
Page 1 of 1
Permissions in this forum:
You cannot reply to topics in this forum
|
|
Wed Dec 18, 2019 9:13 pm by yohanaamon@yahoo.com
» Is non-submission of invalid CRB receipt voucher a major deviation?
Tue Dec 17, 2019 1:00 am by RJM
» MAKANDARASI KUWEKWA NDANI KWA KUTOKAMILISHA MIRADI NDANI YA MUDA
Tue Dec 17, 2019 12:46 am by RJM
» How Supplier can register in e-Procurement system (TANePS)
Thu Dec 12, 2019 5:48 am by pms
» Kukosekana risiti ya ununuzi wa tenda
Sat Apr 27, 2019 6:05 pm by ALLY MUNIR
» IS IT TIME TO THINK OF DEACTIVATING TENDER BOARDS AND INTRODUCE A MECHANISM OF PROCUREMENT PROFESSIONAL OPINION?
Thu Apr 11, 2019 3:40 pm by pms
» e-Procurement System is now operational
Thu Apr 11, 2019 3:14 pm by Admin
» TENDA ZINAPOKOSA WAOMBAJI
Thu Jan 10, 2019 10:42 pm by thanksme
» Attendance of District Treasurer in Council Tender Board meetings
Mon Mar 19, 2018 8:57 pm by GWK