Tanzania Public Procurement Forum
Would you like to react to this message? Create an account in a few clicks or log in to continue.
Navigation
 Portal
 Index
 Memberlist
 Profile
 FAQ
 Search
Latest topics
» HOW TO REGISTER A COMPANY FOR PPRA PROCUREMENTS
Feasibility study and detailed design EmptyWed Dec 18, 2019 9:13 pm by yohanaamon@yahoo.com

» Is non-submission of invalid CRB receipt voucher a major deviation?
Feasibility study and detailed design EmptyTue Dec 17, 2019 1:00 am by RJM

» MAKANDARASI KUWEKWA NDANI KWA KUTOKAMILISHA MIRADI NDANI YA MUDA
Feasibility study and detailed design EmptyTue Dec 17, 2019 12:46 am by RJM

» How Supplier can register in e-Procurement system (TANePS)
Feasibility study and detailed design EmptyThu Dec 12, 2019 5:48 am by pms

» Kukosekana risiti ya ununuzi wa tenda
Feasibility study and detailed design EmptySat Apr 27, 2019 6:05 pm by ALLY MUNIR

» IS IT TIME TO THINK OF DEACTIVATING TENDER BOARDS AND INTRODUCE A MECHANISM OF PROCUREMENT PROFESSIONAL OPINION?
Feasibility study and detailed design EmptyThu Apr 11, 2019 3:40 pm by pms

» e-Procurement System is now operational
Feasibility study and detailed design EmptyThu Apr 11, 2019 3:14 pm by Admin

» TENDA ZINAPOKOSA WAOMBAJI
Feasibility study and detailed design EmptyThu Jan 10, 2019 10:42 pm by thanksme

» Attendance of District Treasurer in Council Tender Board meetings
Feasibility study and detailed design EmptyMon Mar 19, 2018 8:57 pm by GWK

April 2024
MonTueWedThuFriSatSun
1234567
891011121314
15161718192021
22232425262728
2930     

Calendar Calendar

Statistics
We have 1676 registered users
The newest registered user is esagile

Our users have posted a total of 1240 messages in 351 subjects
Who is online?
In total there is 1 user online :: 0 Registered, 0 Hidden and 1 Guest :: 2 Bots

None

[ View the whole list ]


Most users ever online was 225 on Sun Oct 03, 2021 4:24 pm

Feasibility study and detailed design

3 posters

Go down

Feasibility study and detailed design Empty Re: Feasibility study and detailed design

Post  id2013 Tue Sep 10, 2013 3:32 am

RJM/RSM + Other members in the forum,

Is there any conflict of interest shown in our current legislation apart from those of WB guideline from the point of my submission?, This is because, you have engaged the Consultant for only for feasibility study that is contract ended there. Then the Second stage is for detailed design, that is another different contract, could we say there is conflict of interest, and that to say could we say in specific notice that the one involved in the feasibility study should not apply?,
if not, suppose the one who carried out feasibility study apply in the second stage for detailed design, which provision of law will be guided by the Procuring entity to disqualify because of conflict of interest?.

Your contribution is highly needed!

id2013

Posts : 50
Join date : 2013-07-17

Back to top Go down

Feasibility study and detailed design Empty Re: Feasibility study and detailed design

Post  RJM Wed Aug 28, 2013 7:01 pm

RSM,

Will this water down the Conflict of Interest being referred to?

This is what World Bank Guidelines say

Unfair Competitive Advantage

1.10 Fairness and transparency in the selection process require that consultants or their affiliates competing for a specific assignment do not derive a competitive advantage from having provided consulting services related to the assignment in question. To that end, the Borrower shall make available to all the short-listed consultants, together with the request for proposals, all information that would in that respect give a consultant a competitive advantage.
.

RJM
RJM

Posts : 260
Join date : 2009-07-30
Age : 73
Location : What is written without effort is in general read without pleasure

Back to top Go down

Feasibility study and detailed design Empty Re: Feasibility study and detailed design

Post  RSM Wed Aug 28, 2013 4:48 pm

Id2013,

This is a provoking discussion that you are initiating. I remember that Procurement Regulations prohibit inviting the consultant who has carried out feasibility study to be carry out subsquent stages of the project because of perceived conflict of interest.

I tend to agree with this provision, because a consultant who prepared the feasibility study which is used to implement the project will have an advantage over other consultants who are participating.

To overcome this, the Procurement Regulations allows that when inviting tenders for the feasibility study to make it categorically known to all participating consultants that the winning bid can be awarded downstream assignments.

Later on I will consult the Regulations to give you the exact Regulations which prohibits and allows what I have judt discussed above.

RSM

Posts : 150
Join date : 2009-08-11

Back to top Go down

Feasibility study and detailed design Empty Feasibility study and detailed design

Post  id2013 Wed Aug 28, 2013 3:27 am

The PE floated tender to engage Consultant for detailed feasibility study to see whether the project is economic viable and profitable.

the selection process have been completed and the consultant is on site. I want to know from the point of procurement legislations is the Consultant engaged for this stage will also participate during detailed design?, take into account that the design ans supervision of the project will involve and use the information from the feasilibility study because the current exercise involve also with provision of concept design of the project sought.

id2013

Posts : 50
Join date : 2013-07-17

Back to top Go down

Feasibility study and detailed design Empty Re: Feasibility study and detailed design

Post  Sponsored content


Sponsored content


Back to top Go down

Back to top

- Similar topics

 
Permissions in this forum:
You cannot reply to topics in this forum